Todd, KY interconnection queue

1 active project totaling 1,600 MW in the TVA queue, plus 2 with terminal status (shown grayed).

1active projects
1,600active MW
3total filed
Queue IDProjectkVMWResourceStatus
628 Not reported 500 1,600 Gas Active
629 Not reported n/r 1,224 Gas Withdrawn
392 Not reported n/r 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.