TVA request 624
TVA queue ID 624
Queue request 624 was listed in the TVA interconnection queue at the end of 2025 as a 375 MW gas project in Haywood County, TN, according to Berkeley Lab’s queue data file. The filing names Lagoon Creek Combustion Turbine Plant Switchyard, Station No. S6405 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2028.
| Queue ID | 624 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Lagoon Creek Combustion Turbine Plant Switchyard, Station No. S6405 |
| Point of interconnection | Lagoon Creek Combustion Turbine Plant Switchyard, Station No. S6405 |
| County | Haywood |
| State | TN |
| Voltage | Not reported |
| Capacity | 375 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2028-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Haywood, TN: 30 requests in the TVA queue, 6 active totaling 2,584 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Upgrade |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Queue date | 2024-06-12 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.