Haywood, TN interconnection queue

6 active projects totaling 2,584 MW in the TVA queue, plus 24 with terminal status (shown grayed).

6active projects
2,584active MW
30total filed
Queue IDProjectkVMWResourceStatus
172 Not reported n/r 1,070 Other Withdrawn
96 Not reported n/r 850 Other Withdrawn
81 Not reported n/r 800 Other Withdrawn
25RSC-012 Not reported 500 752 Gas Active
74 Not reported n/r 650 Other Withdrawn
85 Not reported n/r 640 Other Withdrawn
210 Not reported n/r 630 Gas Operational
86 Not reported n/r 620 Other Withdrawn
94 Not reported n/r 548 Other Withdrawn
95 Not reported n/r 548 Other Withdrawn
64 Not reported n/r 510 Other Withdrawn
14 Not reported n/r 460 Other Operational
566 Not reported n/r 415 Gas Withdrawn
298 Not reported n/r 400 Solar Withdrawn
82 Not reported n/r 400 Other Withdrawn
624 Not reported n/r 375 Gas Active
59 Not reported n/r 300 Other Operational
631 Not reported n/r 250 Hybrid Withdrawn
434 Not reported n/r 175 Hybrid Withdrawn
638 Not reported n/r 175 Solar Withdrawn
640 Not reported n/r 165 Solar Withdrawn
326 Not reported n/r 150 Solar Withdrawn
373 Not reported n/r 120 Solar Withdrawn
527 Not reported n/r 95 Hybrid Withdrawn
381 Not reported n/r 80 Solar Withdrawn
336 Not reported n/r 79 Solar Withdrawn
496 Not reported n/r 70 Solar Withdrawn
645 Not reported n/r 69 Solar Withdrawn
294 Not reported n/r 67 Solar Withdrawn
515 Not reported n/r 67 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.