TVA request 587
TVA queue ID 587
Queue request 587 was listed in the TVA interconnection queue at the end of 2025 as a 225 MW battery project in Hawkins County, TN, according to Berkeley Lab’s queue data file. The filing names Phipps Bend TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2029.
| Queue ID | 587 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Phipps Bend TL |
| Point of interconnection | Phipps Bend 500 kV TL |
| County | Hawkins |
| State | TN |
| Voltage | 500 kV |
| Capacity | 225 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2029-03-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Hawkins, TN: 8 requests in the TVA queue, 2 active totaling 1,176 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Queue date | 2023-10-11 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.