Hawkins, TN interconnection queue

2 active projects totaling 1,176 MW in the TVA queue, plus 6 with terminal status (shown grayed).

2active projects
1,176active MW
8total filed
Queue IDProjectkVMWResourceStatus
135 Not reported n/r 1,820 Other Withdrawn
136 Not reported n/r 1,820 Other Withdrawn
188 Not reported n/r 1,820 Other Withdrawn
128 Not reported n/r 1,240 Other Withdrawn
221 Not reported n/r 951 Gas Operational
126 Not reported n/r 620 Other Withdrawn
127 Not reported n/r 620 Other Withdrawn
587 Not reported 500 225 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.