Substation Scout

TVA request 547

TVA queue ID 547

Queue request 547 was listed in the TVA interconnection queue at the end of 2025 as a 100 MW battery project in Roane County, TN, according to Berkeley Lab’s queue data file. The filing names Kingston Steam Plant Switchayrd as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2026.

Queue ID547
Project nameNot reported
Status (as published)Active
SubstationKingston Steam Plant Switchayrd
Point of interconnectionKingston Steam Plant 161kV Switchayrd
CountyRoane
StateTN
Voltage161 kV
Capacity100 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Roane, TN: 4 requests in the TVA queue, 3 active totaling 1,839 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Queue date2023-04-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first