Roane, TN interconnection queue

3 active projects totaling 1,839 MW in the TVA queue, plus 1 with terminal status (shown grayed).

3active projects
1,839active MW
4total filed
Queue IDProjectkVMWResourceStatus
489 Not reported n/r 1,689 Gas Active
547 Not reported 161 100 Battery Active
25RSC-002 Not reported 161 50 Nuclear Active
303 Not reported n/r 29 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.