Substation Scout

TVA request 482

TVA queue ID 482

Queue request 482 was listed in the TVA interconnection queue at the end of 2025 as a 110 MW solar project in Cumberland County, TN, according to Berkeley Lab’s queue data file. The filing names Plateau 500-kV Substation (161-kV Interconnection) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 13, 2027.

Queue ID482
Project nameNot reported
Status (as published)Active
SubstationPlateau 500-kV Substation (161-kV Interconnection)
Point of interconnectionPlateau 500-kV Substation (161-kV Interconnection)
CountyCumberland
StateTN
VoltageNot reported
Capacity110 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-09-13
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cumberland, TN: 3 requests in the TVA queue, 1 active totaling 110 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2021-10-05

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.