Cumberland, TN interconnection queue

1 active project totaling 110 MW in the TVA queue, plus 2 with terminal status (shown grayed).

1active projects
110active MW
3total filed
Queue IDProjectkVMWResourceStatus
442 Not reported n/r 200 Solar Withdrawn
482 Not reported n/r 110 Solar Active
272 Not reported n/r 71 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.