TVA request 422

TVA queue ID 422

Queue request 422 was listed in the TVA interconnection queue at the end of 2025 as a 145 MW solar project in Chickasaw County, MS, according to Berkeley Lab’s queue data file. The filing names Okolona 161-kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 31, 2027.

Queue ID422
Project nameNot reported
Status (as published)Active
SubstationOkolona 161-kV Substation
Point of interconnectionOkolona 161-kV Substation
CountyChickasaw
StateMS
VoltageNot reported
Capacity145 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-03-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Chickasaw, MS: 12 requests in the TVA queue, 2 active totaling 295 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2020-04-02

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.