Chickasaw, MS interconnection queue

2 active projects totaling 295 MW in the TVA queue, plus 10 with terminal status (shown grayed).

2active projects
295active MW
12total filed
Queue IDProjectkVMWResourceStatus
585 Not reported n/r 220 Solar Withdrawn
463 Not reported n/r 200 Solar Withdrawn
539 Not reported n/r 200 Hybrid Withdrawn
368 Not reported n/r 175 Solar Withdrawn
425 Not reported n/r 150 Solar Active
540 Not reported n/r 150 Solar Withdrawn
422 Not reported n/r 145 Solar Active
664 Not reported n/r 100 Solar Withdrawn
504 Not reported n/r 70 Solar Withdrawn
343 Not reported n/r 52 Solar Withdrawn
532 Not reported n/r 50 Hybrid Withdrawn
348 Not reported n/r 40 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.