Queue request 416 was listed in the TVA interconnection queue at the end of 2025 as a 780 MW gas project in Colbert County, AL, according to Berkeley Lab’s queue data file. The filing names Colbert Fossil Plant 161-kV Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2022.
| Queue ID | 416 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Colbert Fossil Plant 161-kV Station |
| Point of interconnection | Colbert Fossil Plant 161-kV Station |
| County | Colbert |
| State | AL |
| Voltage | Not reported |
| Capacity | 780 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2022-10-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Colbert, AL: 36 requests in the TVA queue, 5 active totaling 1,185 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Queue date | 2020-02-10 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.