Colbert, AL interconnection queue

5 active projects totaling 1,185 MW in the TVA queue, plus 31 with terminal status (shown grayed).

5active projects
1,185active MW
36total filed
Queue IDProjectkVMWResourceStatus
140 Not reported n/r 1,250 Other Withdrawn
150 Not reported n/r 1,200 Other Withdrawn
192 Not reported n/r 1,200 Other Withdrawn
177 Not reported n/r 1,193 Other Withdrawn
416 Not reported n/r 780 Gas Active
148 Not reported n/r 600 Other Withdrawn
149 Not reported n/r 600 Other Withdrawn
191 Not reported n/r 600 Other Withdrawn
404 Not reported n/r 593 Gas Withdrawn
12 Not reported n/r 350 Other Withdrawn
41 Not reported n/r 350 Other Withdrawn
370 Not reported n/r 227 Solar Withdrawn
386 Not reported n/r 200 Solar Withdrawn
408 Not reported n/r 200 Solar Withdrawn
409 Not reported n/r 200 Solar Withdrawn
451 Not reported n/r 200 Hybrid Withdrawn
521 Not reported n/r 200 Hybrid Withdrawn
73 Not reported n/r 200 Other Withdrawn
387 Not reported n/r 178 Solar Active
480 Not reported n/r 170 Solar Withdrawn
498 Not reported n/r 170 Hybrid Withdrawn
354 Not reported n/r 150 Solar Withdrawn
410 Not reported n/r 150 Solar Withdrawn
576 Not reported n/r 150 Solar Withdrawn
339 Not reported n/r 100 Solar Withdrawn
580 Not reported n/r 100 Solar Withdrawn
591 Not reported n/r 100 Solar Withdrawn
286 Not reported n/r 80 Solar Operational
287 Not reported n/r 80 Solar Withdrawn
327 Not reported n/r 80 Solar Operational
328 Not reported n/r 80 Solar Withdrawn
450 Not reported n/r 70 Hybrid Withdrawn
288 Not reported n/r 67 Solar Withdrawn
291 Not reported n/r 67 Solar Operational
578 Not reported n/r 57 Solar Withdrawn
295 Not reported n/r 20 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.