TVA request 341

TVA queue ID 341

Queue request 341 was listed in the TVA interconnection queue at the end of 2025 as a 100 MW solar project in Lowndes County, MS, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of March 24, 2023.

Queue ID341
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyLowndes
StateMS
VoltageNot reported
Capacity100 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-03-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lowndes, MS: 33 requests in the TVA queue, 12 active totaling 2,820 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2018-03-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.