TVA request 321

TVA queue ID 321

Queue request 321 was listed in the TVA interconnection queue at the end of 2025 as a 11 MW hydro project in Marion County, TN, according to Berkeley Lab’s queue data file. The filing names Raccoon Mountain 161-kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 15, 2021.

Queue ID321
Project nameNot reported
Status (as published)Active
SubstationRaccoon Mountain 161-kV Substation
Point of interconnectionRaccoon Mountain 161-kV Substation
CountyMarion
StateTN
VoltageNot reported
Capacity11 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2021-01-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Raccoon Mountain 161-kV Substation substation: 4 requests in the TVA queue, 4 active totaling 76 MW.

Queue IDProjectMWResourceStatus
322Not reported27HydroActive
323Not reported27HydroActive
320Not reported11HydroActive

Marion, TN: 7 requests in the TVA queue, 6 active totaling 87 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeUpgrade
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2017-08-04

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.