Queue request 299 was listed in the TVA interconnection queue at the end of 2025 as a 67 MW solar project in Lake County, TN, according to Berkeley Lab’s queue data file. The filing names Highway 412-New Tiptonville 161-kV TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2020.

Queue ID299
Project nameNot reported
Status (as published)Active
SubstationHighway 412-New Tiptonville 161-kV TL
Point of interconnectionHighway 412-New Tiptonville 161-kV TL
CountyLake
StateTN
VoltageNot reported
Capacity67 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2020-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Highway 412-New Tiptonville 161-kV TL substation: 2 requests in the TVA queue, 2 active totaling 147 MW.

Queue IDProjectMWResourceStatus
292Not reported80SolarActive

Lake, TN: 10 requests in the TVA queue, 3 active totaling 177 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeUpgrade
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2016-07-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first