Substation Scout

Lake, TN interconnection queue

3 active projects totaling 177 MW in the TVA queue, plus 7 with terminal status (shown grayed).

3active projects
177active MW
10total filed
Queue IDProjectkVMWResourceStatus
371 Not reported n/r 227 Solar Withdrawn
653 Not reported n/r 100 Solar Withdrawn
292 Not reported n/r 80 Solar Active
260 Not reported n/r 68 Solar Withdrawn
338 Not reported n/r 68 Solar Withdrawn
430 Not reported n/r 68 Solar Withdrawn
299 Not reported n/r 67 Solar Active
337 Not reported n/r 30 Solar Active
435 Not reported n/r 17 Battery Withdrawn
473 Not reported n/r 9 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.