TVA request 25RSC-011

TVA queue ID 25RSC-011

Queue request 25RSC-011 was listed in the TVA interconnection queue at the end of 2025 as a 528 MW gas project in Morgan County, AL, according to Berkeley Lab’s queue data file. The filing names TVA'S MORGAN ENERGY CENTER, AL SWITCHING STATION as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 22, 2031.

Queue ID25RSC-011
Project nameNot reported
Status (as published)Active
SubstationTVA'S MORGAN ENERGY CENTER, AL SWITCHING STATION
Point of interconnectionTVA'S MORGAN ENERGY CENTER, AL 161KV SWITCHING STATION
CountyMorgan
StateAL
Voltage161 kV
Capacity528 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2031-04-22
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Morgan, AL: 6 requests in the TVA queue, 5 active totaling 2,254 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Queue date2025-08-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.