Morgan, AL interconnection queue

5 active projects totaling 2,254 MW in the TVA queue, plus 1 with terminal status (shown grayed).

5active projects
2,254active MW
6total filed
Queue IDProjectkVMWResourceStatus
54 Not reported n/r 1,000 Other Withdrawn
67 Not reported n/r 800 Other Operational
72 Not reported n/r 800 Other Operational
25RSC-011 Not reported 161 528 Gas Active
403 Not reported n/r 94 Gas Operational
261 Not reported n/r 32 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.