Rankin, MS interconnection queue

1 active project totaling 140 MW in the TVA queue, plus 2 with terminal status (shown grayed).

1active projects
140active MW
3total filed
Queue IDProjectkVMWResourceStatus
572 Not reported n/r 240 Solar Withdrawn
672 Not reported 161 140 Solar Active
529 Not reported n/r 100 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.