Maury, TN interconnection queue

1 active project totaling 100 MW in the TVA queue, plus 13 with terminal status (shown grayed).

1active projects
100active MW
14total filed
Queue IDProjectkVMWResourceStatus
165 Not reported n/r 1,450 Other Withdrawn
162 Not reported n/r 1,100 Other Withdrawn
183 Not reported n/r 926 Other Withdrawn
99 Not reported n/r 850 Other Withdrawn
147 Not reported n/r 800 Other Withdrawn
90 Not reported n/r 640 Other Withdrawn
182 Not reported n/r 617 Other Withdrawn
176 Not reported n/r 586 Other Withdrawn
111 Not reported n/r 555 Other Withdrawn
88 Not reported n/r 555 Other Withdrawn
87 Not reported n/r 320 Other Withdrawn
89 Not reported n/r 320 Other Withdrawn
513 Not reported n/r 145 Battery Withdrawn
611 Not reported 161 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.