Graves, KY interconnection queue

1 active project totaling 140 MW in the TVA queue.

1active projects
140active MW
1total filed
Queue IDProjectkVMWResourceStatus
25RSC-010 Not reported 161 140 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.