In NV Energy’s Annual Progress Report to the Western Electricity Coordinating Council, project “Greenlink Nevada West (GLW)”.

Not printedcounty (not printed)
500kV as printed
NVEreport
May 2027 (Greenlink West, as printed)in service, as printed

Expansion at an existing substation: new voltage level. The quoted wording describes a yard, bus or conversion at a voltage this substation is not otherwise shown at. “Fort Churchill substation upgrades : New 500 kV, 345 kV and 230 kV switchyards will be built, including new transformers: 2x500/345kV (600MVA), 2x345/230kV (300MVA), and 2x345/120kV (280MVA).” — NV Energy 2026 Annual Progress Report, p.8

Existing station: The same report has Fort Churchill as an existing 345 kV substation (the Libra Solar interconnection); a 500 kV yard is a new voltage there. “interconnect 700 MW PV/ BESS at Fort Churchill 345 kV substation” — NV Energy 2026 Annual Progress Report, p.4

Also printed as: Fort Churchill · Ft. Churchill

Note. Walker River is the new name of Fort Churchill ("Walker River (f.k.a. Fort Churchill)", the report says), near Yerington. It is the western end of both Greenlink lines.

The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.

Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.