Sand Dune
In NV Energy’s Annual Progress Report to the Western Electricity Coordinating Council, project “Sand Dune 230 kV Switching Station”.
Described as new. The quoted wording calls this substation proposed or future. “Sand Dune 230 kV Switching Station This project is being proposed to support the commercial and industrial customers in the Apex area.” — NV Energy 2026 Annual Progress Report, p.9
Note. The report says the switching station folds the existing Harry Allen - Pecos 230 kV line #1.
The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.
Location
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. Somewhere on the Harry Allen - Pecos 230 kV line #1 "in the Apex area"; no filing placing the station was found.
Sources: NV Energy 2026 Annual Progress Report to WECC (2026), p.9 · HIFLD Electric Substations (as ingested by Site Scanner): HARRY ALLEN (230KV), PECOS (fetched 2026-08-30). Researched by Substation Scout; checked November 21, 2026.
Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- The WECC Annual Progress Reports print no county for a substation. A county shown here is printed for that station elsewhere; otherwise it is left blank.
- WECC asks for transmission additions over 200 kV, generation of 200 MW or more, and smaller facilities that may have a significant regional impact (the thresholds as Valley Electric’s 2026 report states them). NV Energy also lists many 120 kV and 138 kV projects, but a substation missing from a report may still be planned.
- An in-service date is the one the report prints, not a construction schedule.