Redwood
In NV Energy’s Annual Progress Report to the Western Electricity Coordinating Council, project “Redwood Expansion (Project Sutro)”.
Described as new. The quoted wording calls this substation new. “This includes new Redwood 120 kV substation” — NV Energy 2026 Annual Progress Report, p.2
Note. The report says phase 1 was energized in November 2024 with an initial load of about 3 MW.
Note. The report says the project serves Redwood Materials in the Tahoe Reno Industrial Complex from a new 120 kV line out of Comstock Meadows Substation: an initial load addition of 82 MW and an ultimate addition of 140 MW in 2027.
The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.
Location
Storey County, NV
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The EA places the switchyard on the western portion of the 173-acre site off Battery Boulevard (formerly Norway Drive) and shows it on Figure 2-2 (Site Layout), which was not georeferenced; no coordinates or APNs are printed in the EA text read.
Note: Identity step: NV Energy's report does not print the EA's words and the EA does not print the name Redwood for the switchyard. The tie is the same customer (Redwood Materials, TRIC), the same voltage (120 kV) and the same source substation (NV Energy calls it Comstock Meadows; the EA calls it the Comstock Substation, directly south of the site).
Sources: NV Energy 2026 Annual Progress Report to WECC (2026), p.2 · DOE Loan Programs Office, Final Environmental Assessment and FONSI (DOE/EA-2228), Redwood Materials, Inc., McCarran, Nevada (November 2023), PDF p.12. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Storey, NV: NV Energy queue, 9 active of 15. Same county, not the same substation.
Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- The WECC Annual Progress Reports print no county for a substation. A county shown here is printed for that station elsewhere; otherwise it is left blank.
- WECC asks for transmission additions over 200 kV, generation of 200 MW or more, and smaller facilities that may have a significant regional impact (the thresholds as Valley Electric’s 2026 report states them). NV Energy also lists many 120 kV and 138 kV projects, but a substation missing from a report may still be planned.
- An in-service date is the one the report prints, not a construction schedule.