Lazy 5
In NV Energy’s Annual Progress Report to the Western Electricity Coordinating Council, project “Lazy 5 120 kV Substation”.
Described as new. The quoted wording calls this substation new. “Lazy 5 120 kV Substation This new 120 kV substation includes the installation of two 120/24 kV 60 MVA transformers” — NV Energy 2026 Annual Progress Report, p.2
Note. The report says it serves expanding commercial and residential loads in the Spanish Springs area and folds into the existing North Redrock - Sugarloaf 120 kV line.
The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.
Location
Washoe County, NV
County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The BLM announcements point to a project map on BLM ePlanning (project 2038946); ePlanning served a bot challenge to scripted access and was not read. No Washoe County special use permit for Lazy 5 was found.
Sources: NV Energy 2026 Annual Progress Report to WECC (2026), p.2 · BLM approves Lazy 5 transmission line (Sierra Front Field Office) (2025-12-15) · BLM seeks initial input on proposed Lazy 5 Transmission Line Project (2025-06-18). Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Washoe, NV: NV Energy queue, 17 active of 38. Same county, not the same substation.
Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- The WECC Annual Progress Reports print no county for a substation. A county shown here is printed for that station elsewhere; otherwise it is left blank.
- WECC asks for transmission additions over 200 kV, generation of 200 MW or more, and smaller facilities that may have a significant regional impact (the thresholds as Valley Electric’s 2026 report states them). NV Energy also lists many 120 kV and 138 kV projects, but a substation missing from a report may still be planned.
- An in-service date is the one the report prints, not a construction schedule.