Lander
In NV Energy’s Annual Progress Report to the Western Electricity Coordinating Council, project “Greenlink Nevada North (GLN)”.
Described as new. The quoted wording calls this substation new. “construction of the new Lander 525/230 kV collector substations along the line” — NV Energy 2026 Annual Progress Report, p.3
Note. A collector station on Greenlink North, the proposed 235-mile 525 kV line between Robinson Summit (northeast Nevada) and Walker River (western Nevada), for the interconnection of renewable resources. The report says the Bureau of Land Management issued a draft Environmental Impact Statement.
The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.
Location
Lander County, NV
County of the area the plan places it in. No source prints a location. The plan places the substation relative to a mapped feature, and everywhere within that range is in one county. No point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: No point. The October 2020 placement is in words only. NV Energy's July 2020 UEPA notice to the PUCN draws a "Proposed Lander Substation" symbol on a PLSS-gridded sheet (in or near T19N R45E, by US 50, beside a 230 kV line, sheet labelled LANDER CO.), but that is a 2020 conceptual site and NV Energy's March 2026 county presentation says alternative substation locations were later dropped; the statewide 2026 map draws Lander inside the Lander County outline at a scale too small for a point.
Note: The July 2020 UEPA map draws the proposed Lander symbol close to US 50 and the existing 230 kV line, roughly west of or at Frontier's longitude (T19N R45E), not 9 miles east; both placements are in Lander County. The Greenlink North Final EIS (BLM ePlanning) would settle the selected site but ePlanning served a bot challenge to scripted access and was not read.
County: the plan prints “The project is planned to include an intermediate substation “Lander” to be located approximately 9 miles east of the existing Frontier 230 kV substation. Lander would include a 525/230 kV step down transformer and available 230 kV terminals for future interconnections.”. Nominal point 9 miles (14.5 km) due east of Frontier: 39.5059, -116.692. Census TIGERweb county at 12 points on an 8 km circle around it (every 30 degrees) and at its center: all Lander County. The Lander/Eureka county line runs north-south at about -116.595 between 39.35 and 39.65 (Census: -116.60 Lander, -116.59 Eureka), just outside the circle's east edge. Points 15 and 20 miles east of Frontier are in Eureka County, so the reading depends on "approximately 9 miles" being roughly right.
Sources: NV Energy 2026 Annual Progress Report to WECC (2026), p.3 · NV Energy, Greenlink Nevada (October 2020; 2021 IRP technical appendix TRAN-1A), as posted by the Nevada Division of State Lands (October 2020), PDF p.20, section Ft Churchill – Robinson Summit 525 kV · NV Energy notice under the Utility Environmental Protection Act of an application for approval by a federal agency to construct the Greenlink North Transmission Project (PUCN, Docket No. 20-07___), with Attachment A project maps (July 20, 2020), PDF p.15 · NV Energy, Greenlink North Transmission Project presentation to the White Pine County Board of County Commissioners (March 25, 2026), slide 3 · Census TIGERweb county lookup (circle check around the nominal point) (queried 2026-11-21). Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Lander, NV: NV Energy queue, 20 active of 41. Same county, not the same substation.
Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- The WECC Annual Progress Reports print no county for a substation. A county shown here is printed for that station elsewhere; otherwise it is left blank.
- WECC asks for transmission additions over 200 kV, generation of 200 MW or more, and smaller facilities that may have a significant regional impact (the thresholds as Valley Electric’s 2026 report states them). NV Energy also lists many 120 kV and 138 kV projects, but a substation missing from a report may still be planned.
- An in-service date is the one the report prints, not a construction schedule.