Esmeralda
In NV Energy’s Annual Progress Report to the Western Electricity Coordinating Council, project “Greenlink Nevada West (GLW)”.
Described as new. The quoted wording calls this substation new. “construction of the new Sagebrush (f.k.a., Amargosa) 525 kV collector station, Esmeralda 525 kV collector station” — NV Energy 2026 Annual Progress Report, p.8
Note. A collector station on Greenlink West. The report lists it in the same sentence as the new Sagebrush station.
The progress report prints no county for this substation, and none has been found printed for it elsewhere yet.
Location
38.0097, -117.8083 · Esmeralda County, NV · view on a map
Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±600 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Point printed by NV Energy in the Greenlink West Plan of Development (July 2021), Table 3 Microwave Radio Facilities: "Esmeralda Substation 38.009710 -117.808260 Substation", i.e. microwave equipment "constructed within the substation boundaries". Table 4 prints the substation's optical amplifier at 38.011207, -117.806652, about 220 m away, so both lie in the yard. ±600 m: the POD sized the site at 71 acres; the 2024 Record of Decision describes an approximately 109-acre substation (about 660 m on a side), and where the yard sits inside it is not printed. Consistency check: the point is about 4.5 miles east-southeast of Coaldale Junction (US 95/US 6, OSM node 150938824 at 38.0313, -117.8867), matching the ROD's "approximately 4.4 miles southeast of the US 95/US 6) junction".
Note: The coordinate is from the 2021 Plan of Development, which sized the substation at 71 acres; the 2024 ROD analyzes an approximately 109-acre substation at ES-2 (the Proposed Action), so the fence line may have grown around the printed point. The POD's prose places it "approximately 32 miles west of Tonopah, Nye County, Nevada": the county there belongs to Tonopah; the same POD's facility table prints Esmeralda County for the substation.
Sources: NV Energy 2026 Annual Progress Report to WECC (2026), p.8 · Greenlink West Transmission Project Record of Decision and Approved Resource Management Plan Amendments (BLM, joint with DOE/NNSA, DOE/EIS-0564) (September 2024), PDF pp.23-24 · Greenlink West Transmission Project Plan of Development, Rev 1 (Nevada Power Company and Sierra Pacific Power Company d/b/a NV Energy) (July 30, 2021), PDF p.16 · NDEP Clean Water Act Section 401 application, Greenlink West Transmission Project (NV Energy), with Project Location map (map dated 2024-04-05), p.5 · OpenStreetMap: Coaldale Junction (US 95/US 6), Esmeralda County (OSM, queried 2026-11-21). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Generation interconnection requests filed in Esmeralda, NV: NV Energy queue, 8 active of 24. Same county, not the same substation.
Source: WECC Annual Progress Reports filed with the WECC Studies Subcommittee: NV Energy 2026 Annual Progress Report (dated March 4, 2026); NV Energy 2025 Annual Progress Report (dated February 3, 2025); GridLiance West 2026 Annual Progress Report (dated March 13, 2026). Retrieved 2026-11-21; records reviewed by hand 2026-11-21.
Before relying on any of this
- The WECC Annual Progress Reports print no county for a substation. A county shown here is printed for that station elsewhere; otherwise it is left blank.
- WECC asks for transmission additions over 200 kV, generation of 200 MW or more, and smaller facilities that may have a significant regional impact (the thresholds as Valley Electric’s 2026 report states them). NV Energy also lists many 120 kV and 138 kV projects, but a substation missing from a report may still be planned.
- An in-service date is the one the report prints, not a construction schedule.