Lumberjack

In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50617 of Ameren Missouri, MISO Central region.

MOstate, from the owner’s name
345kV as printed
$38.5Mestimated cost, as printed
12/1/2027in service, as printed

Described as new. The quoted wording calls this substation new. “New 345 kV Lumberjack substation for Load Connection” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50617, p.59

Project50617: “New 345 kV Lumberjack substation for Load Connection” (p.59)
Transmission ownerAmeren Missouri (AMMO)
CategoryLoad Growth
Expedited Project ReviewYes, as the report marks it

The MTEP report prints no county for this substation.

Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.