Admiral
In the 2025 MISO Transmission Expansion Plan (MTEP25), project 50196 of Entergy Louisiana LLC, MISO South region.
LAstate, from the owner’s name
138kV as printed
$54.4Mestimated cost, as printed
9/1/2025in service, as printed
Described as new. The quoted wording calls this substation new. “Admiral 138 kV New Substation and Transmission Line” — MTEP25 Report (2025 MISO Transmission Expansion Plan), project 50196, p.123
| Project | 50196: “Admiral 138 kV New Substation and Transmission Line” (p.123) |
|---|---|
| Transmission owner | Entergy Louisiana LLC (ELL) |
| Category | Load Growth |
| Expedited Project Review | Yes, as the report marks it |
The MTEP report prints no county for this substation.
Source: MTEP25 Report (2025 MISO Transmission Expansion Plan), approved by the MISO Board of Directors December 11, 2025; 428 of its 432 Appendix A projects are printed by name. Retrieved 2026-11-21; stations reviewed by hand 2026-11-21.
Before relying on any of this
- The MTEP report prints no state or county column. A state shown here is the one printed in the transmission owner’s name (“Ameren Missouri”, “Entergy Texas”); for owners that serve several states it is left blank, as is a county no source prints for the station.
- The report prints 428 of the 432 projects in its Appendix A by name; a project it does not print is not read here, and a substation built under a project whose name does not describe a new station is not listed.
- An in-service date and a cost are the ones the report prints (cost in millions of dollars, as estimated), not a construction schedule.
- A few projects are printed only as a heading over a map image (baseline reliability projects such as Pond Creek and War Eagle); their in-service date and cost appear in the image, not the report’s text, and are not shown here.
Site Scanner