TENASKA
Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035), plus 1 on its cancelled or completed lists.
—county (not printed)
—kV in the quote
GTCproject sponsor
1projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: TENASKA - WANSLEY 500kV NEW LINE Construct 5 miles of 500kV line between Tenaska and Wansley. Make necessary accommodations at Tenaska for the line termination and reconfigure Wansley substation TEAMS 21123 · plan p.211 · zone 201 |
GTC | In the plan p.16 |
Jun 1, 2029 | No change | TENASKA, Wansley |
On the cancelled or completed lists
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: HEARD COUNTY - TENASKA 500kV (SECOND LINE) TEAMS 18774 · zone 213 |
Not printed | Completed list p.26 |
Dec 1, 2025 as listed |
— | HEARD COUNTY, TENASKA |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.