Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
MEAGproject sponsor
3projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
MEAG: RAY PLACE RD - WARRENTON PRIMARY 115kV RECONDUCTOR
Reconductor approximately 10 miles of the Ray Place - Warrenton Primary 115kV line with 170C ACSS conductor. Upgrade limiting element at substation along the line.
TEAMS 20264 · plan p.143 · zone 215
MEAG In the plan
p.11
Jun 1, 2027 No change Ray Place, Ray Place Rd, Warrenton Primary
MEAG: RAY PLACE RD - WASHINGTON 115kV LINE REBUILD
Rebuild approximately 17.4 miles of the Ray Place Rd - Washington 115kV line using 100C 795 ACSR conductor and upgrade limiting elements at substation along the line.
TEAMS 20270 · plan p.141 · zone 215
MEAG In the plan
p.11
Jun 1, 2027 Delayed from 2026 to 2027. Ray Place Rd, Washington
MEAG: RAY PLACE RD - WASHINGTON (WASHNGTN - WASHNGTN 3) 115kV
Rebuild approximately 1.6 miles of the Ray Place Rd - Washington 115kV line using 100C 1351 ACSR conductor. Upgrade limiting element at substation along the line.
TEAMS 20271 · plan p.142 · zone 215
MEAG In the plan
p.11
Jun 1, 2027 Delayed from 2026 to 2027 Ray Place Rd, Washington

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.