Substation Scout

North Jackson

Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
2projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
CC - NORTH GEORGIA NETWORK UPGRADES
Construct approximately 7 miles of 115kV line with minimum 170C 1351 ACSS conductor on the North Jackson - Lawrence Smith 46kV ROW that is to be retired. Disconnect the East Maysville 115kV tap at Midway 115kV and terminate the new Pond Fork - Midway 115kV line.
TEAMS 21130 · plan p.236 · zone 212
GPC In the plan
p.18
Jun 1, 2030 No change Lawrence Smith, Midway, North Jackson, Pond Fork
GTC: POND FORK - MIDWAY 115kV LINE
Construct approximately 6 miles of 115kV line with minimum 170C 1351 ACSS conductor utilizing the existing GTC owned portion of the North Jackson - Lawrence Smith 46kV ROW. Add a second 230/115kV auto transformer at Pond Fork substation.
TEAMS 21131 · plan p.251 · zone 212
GTC In the plan
p.19
Jun 1, 2030 No change Lawrence Smith, Midway, North Jackson, Pond Fork

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.