Midway
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
2projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| CC - NORTH GEORGIA NETWORK UPGRADES Construct approximately 7 miles of 115kV line with minimum 170C 1351 ACSS conductor on the North Jackson - Lawrence Smith 46kV ROW that is to be retired. Disconnect the East Maysville 115kV tap at Midway 115kV and terminate the new Pond Fork - Midway 115kV line. TEAMS 21130 · plan p.236 · zone 212 |
GPC | In the plan p.18 |
Jun 1, 2030 | No change | Lawrence Smith, Midway, North Jackson, Pond Fork |
| GTC: POND FORK - MIDWAY 115kV LINE Construct approximately 6 miles of 115kV line with minimum 170C 1351 ACSS conductor utilizing the existing GTC owned portion of the North Jackson - Lawrence Smith 46kV ROW. Add a second 230/115kV auto transformer at Pond Fork substation. TEAMS 21131 · plan p.251 · zone 212 |
GTC | In the plan p.19 |
Jun 1, 2030 | No change | Lawrence Smith, Midway, North Jackson, Pond Fork |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.
Site Scanner