North Dublin
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
2projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GORDON-N DUBLIN 115kV (GORDON-ENGL MCI J) REBUILD Rebuild approximately 6 miles of the Gordon - North Dublin 115kV line with 200C ACSS 795 conductor. TEAMS 19618 · plan p.95 · zone 214 |
GPC | In the plan p.8 |
Jun 1, 2026 | No change | Gordon, North Dublin |
| GTC: ACHORD ROAD - NORTH DUBLIN 115kV LINE Rebuild the Achord Road to North Dublin 115kV line (approximately 9.84 miles) with 200C 1351 ACSS conductor. TEAMS 21618 · plan p.274 · zone 214 |
GTC | In the plan p.20 |
Jun 1, 2031 | New project | ACHORD ROAD, North Dublin |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.