Deptford

Named in 1 project in the 2025 GA ITS Ten-Year Plan (2026-2035), plus 1 on its cancelled or completed lists.

—county (not printed)
—kV in the quote
SAVproject sponsor
1projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
SAV: BOULEVARD - DEPTFORD 115kV RECONDUCTOR
Reconductor the Boulevard - Deptford 115kV line (approximately 8 miles) using 973.1 C7 ACCS (Everglades) conductor. Upgrade main bus and jumpers at Bolton substation with higher rated equipment.
TEAMS 20066 · plan p.104 · zone 219
SAV In the plan
p.8
Jun 1, 2026 No change Bolton, Boulevard, Deptford

On the cancelled or completed lists

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
SAV: DEPTFORD - MAGNOLIA 115kV RECONDUCTOR
TEAMS 20067 · zone 219
Not printed Completed list
p.26
Jun 1, 2025
as listed
— Deptford, Magnolia

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.