Substation Scout

Boulevard

Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPC, SAVproject sponsor
2projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
SAV: BOULEVARD - DEPTFORD 115kV RECONDUCTOR
Reconductor the Boulevard - Deptford 115kV line (approximately 8 miles) using 973.1 C7 ACCS (Everglades) conductor. Upgrade main bus and jumpers at Bolton substation with higher rated equipment.
TEAMS 20066 · plan p.104 · zone 219
SAV In the plan
p.8
Jun 1, 2026 No change Bolton, Boulevard, Deptford
BOULEVARD - VIRGINIA AVENUE 230kV LINE RECONDUCTOR
Reconductor 0.94 miles of the Boulevard - Virginia Avenue 230kV line with 180C Everglades C7. Replace the limiting elements on the line.
TEAMS 21293 · plan p.192 · zone 206
GPC In the plan
p.15
Jun 1, 2029 New project Boulevard, Virginia Avenue

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first