Cash Creek
Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035), in Banks County.
Described as new. The quoted wording calls this substation new. “new Cash Creek facility” — TEAMS 09661, plan p.290
County: “connecting the McGrau Ford Substation in Cherokee County to the Cash Creek Substation in Banks County” — Georgia Power, Cash Creek–McGrau Ford 500 kV Transmission Project page, retrieved 2026-11-20. The plan itself prints no county column.
Location
34.4235, -83.4014 · Banks County, GA · view on a map
Point published by the utility. The utility publishes this point, on a project map or in a filing. Accurate to about ±300 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Printed by the sponsor: Georgia Power's Cash Creek–McGrau Ford project page embeds its project map's configuration, with a point marker titled "Cash Creek Substation" at 34.42347782, -83.401423327; the printed 500 kV route (87 vertices, source file 'Web_Coordinates_McGrau_Ford-Cash Creek.xlsx') ends on it, and the route's other end is the McGrau Ford Substation marker (34.3279,-84.3362, ~180 m from OSM's McGrau Ford Substation). Web-map marker, not a survey: the page says "MAP NOT BASED ON FIELD SURVEY DATA" and "Structure and Line Locations based on Pre-Engineering data and subject to change". ±300 m (marker for a planned 500 kV yard).
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.290 · 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.292 · Georgia Power, Cash Creek–McGrau Ford 500 kV Transmission Project page (n/a (retrieved 2026-11-20)), About the Project; Project Map. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| CASH CREEK - MCGRAU FORD 500kV NEW LINE Construct a new 500kV line from McGrau Ford to the new Cash Creek facility with (3) 100C 1113 ACSR conductor. TEAMS 09661 · plan p.290 · zone 212 |
GPC | In the plan p.21 |
Jun 1, 2033 | No change | Cash Creek, McGrau Ford |
| GTC: CASH CREEK - EAST WALTON 500kV NEW LINE Construct a new 500kV line from East Walton to the new Cash Creek substation, approximately 45 miles long with (3) 100C 1113 ACSR conductor. Make all necessary accommodations for new 500kV breakers at East Walton. Build a new Cash Creek 500kV facility in close proximity to Middle Fork substation to terminate the two new 500kV line. TEAMS 21075 · plan p.292 · zone 212 |
GTC | In the plan p.22 |
Jun 1, 2033 | No change | Cash Creek, East Walton, Middle Fork |
| GTC: CASH CREEK - HARTWELL ENERGY 230kV LINE Construct a new 230kV line, approx. 35 miles, from Hartwell Energy to Middle Fork, using (2) 200C 1351 ACSS conductor. Expand Hartwell Energy 230kV and Middle Fork 230kV substations for the new line termination. TEAMS 21113 · plan p.79 · zone 212 |
GTC | In the plan p.19 |
Jun 1, 2030 | No change | Cash Creek, Hartwell Energy, Middle Fork |
Generation interconnection requests filed in Banks, GA: Southern Company queue, 0 active of 1. Same county, not the same substation.
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.