Arkwright
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
—county (not printed)
—kV in the quote
GPCproject sponsor
2projects in the plan
The plan prints no county for this substation, and no utility project page found names one for it.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GRID: ARKWRIGHT - LLOYD SHOALS 115kV LINE REBUILD Rebuild the Arkwright - Lloyd Shoals 115kV line, approximately 37 miles, with 100C 795 ACSR conductor. TEAMS 18573 · plan p.148 · zone 214 |
GPC | In the plan p.12 |
Jul 30, 2027 | No change | Arkwright, Lloyd Shoals |
| ARKWRIGHT BUS AND JUMPER REPLACEMENT Replace the 115kV bus at Arkwright and replace the jumper on the Arkwright - Forrest Rd (Macon) 115kV line with higher rated equipment. TEAMS 20767 · plan p.86 · zone 214 |
GPC | In the plan p.7 |
Jun 1, 2026 | Advanced from 2033 to 2026 | Arkwright, Forrest Rd |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.