Wilbarger, TX interconnection queue
2 active projects totaling 500 MW in the SPP queue, plus 10 with terminal status (shown grayed).
2active projects
500active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2008-031 | Not reported | n/r | 4,000 | Wind | Withdrawn |
| GEN-2024-098 | Not reported | 345 | 400 | Solar | Withdrawn |
| GEN-2022-221 | Not reported | 345 | 350 | Solar | Withdrawn |
| GEN-2024-230 | Not reported | 345 | 300 | Battery | Active |
| GEN-2018-091 | Not reported | 345 | 250 | Battery | Withdrawn |
| GEN-2022-242 | Not reported | 345 | 250 | Battery | Withdrawn |
| GEN-2017-065 | Not reported | 345 | 200.3 | Solar | Withdrawn |
| GEN-2008-095 | Not reported | n/r | 200 | Hydro | Withdrawn |
| GEN-2022-222 | Not reported | 345 | 200 | Battery | Withdrawn |
| GEN-2022-223 | Not reported | 345 | 200 | Battery | Withdrawn |
| GEN-2024-229 | Not reported | 345 | 200 | Solar | Active |
| GEN-2008-094 | Not reported | n/r | 100 | Hydro | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.