2 active projects totaling 500 MW in the SPP queue, plus 10 with terminal status (shown grayed).

2active projects
500active MW
12total filed
Queue IDProjectkVMWResourceStatus
GEN-2008-031 Not reported n/r 4,000 Wind Withdrawn
GEN-2024-098 Not reported 345 400 Solar Withdrawn
GEN-2022-221 Not reported 345 350 Solar Withdrawn
GEN-2024-230 Not reported 345 300 Battery Active
GEN-2018-091 Not reported 345 250 Battery Withdrawn
GEN-2022-242 Not reported 345 250 Battery Withdrawn
GEN-2017-065 Not reported 345 200.3 Solar Withdrawn
GEN-2008-095 Not reported n/r 200 Hydro Withdrawn
GEN-2022-222 Not reported 345 200 Battery Withdrawn
GEN-2022-223 Not reported 345 200 Battery Withdrawn
GEN-2024-229 Not reported 345 200 Solar Active
GEN-2008-094 Not reported n/r 100 Hydro Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first