Wormser Road
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Webb County. First named in the release with data as of October 1, 2023.
Webbcounty as printed
138kV
AEP TCCutility
1projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Webb, TX: ERCOT queue, 20 active of 22. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Wormser Road: Construct New 138 kV Terminal Interconnect Seven Flags BESS to the Wormser Road 138 kV station ERCOT project 76234 · utility no. TP2023311 |
AEP TCC Tier 4 |
Under Construction Completed tab |
138 | Sep 2025 actual 2025-09 |
Wormser Road Webb County |
Wormser Road |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| October 1, 2025 | 76234 | Moved between tabs | Current-year planned → Completed |
| October 1, 2025 | 76234 | Status as reported | Planned → Under Construction |
| October 1, 2025 | 76234 | Projected in-service date | Jul 2025 → Sep 2025 |
| June 1, 2025 | 76234 | Moved between tabs | Future → Current-year planned |
| June 1, 2025 | 76234 | Projected in-service date | May 2025 → Jul 2025 |
| October 1, 2024 | 76234 | Status as reported | Conceptual → Planned |
| June 1, 2024 | 76234 | Projected in-service date | Jun 2025 → May 2025 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.