Brenham North
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Washington County. First named in the release with data as of June 1, 2026.
Washingtoncounty as printed
138kV
BBEC, LCRATSCutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Washington, TX: ERCOT queue, 0 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| LCRATSC Brenham North - Highway 36 Transmission Line Overhaul Perform an overhaul on the 9.1 mile T215 Brenham North - Highway 36 138-kV transmission line. ERCOT project 103835 |
LCRATSC Tier 4 |
Planned Future tab |
138 | May 2029 | Brenham North to Highway 36 Washington County |
Brenham North, Highway 36 |
| BBEC Brenham North to Sandy Hill Transmission Line Upgrade Replace 336 (Linnet) conductor with 959 (Suwannee) and replace a limited number of structures to accommodate the new conductor. ERCOT project 104609 |
BBEC Tier 4 |
Planned Future tab |
138 | Dec 2029 | Brenham North to Sandy Hill Washington County |
Brenham North, Sandy Hill |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 103835 | Projected in-service date | May 2028 → May 2029 |
| June 1, 2026 | 103835 | First listed | on the Future tab |
| June 1, 2026 | 104609 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.