Substation Scout

Airport

Named in 0 listed projects in ERCOT’s transmission project tracking workbook, in Victoria County, plus 1 on its Cancelled tab. First named in the release with data as of February 1, 2015.

Victoriacounty as printed
69kV
STECutility
0projects listed

Projects cancelled. Every project naming Airport is on the Cancelled tab of ERCOT's workbook.

No HIFLD substation record has this name in this county (a record of the same name exists in another county).

Generation interconnection requests filed in Victoria, TX: ERCOT queue, 17 active of 22. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

No projects.

On the Cancelled tab

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Airport 69 kV Substation
Build new load serving station in the 69 kV line from Lone Tree to Twin Pines Switch.
ERCOT project 13TPIT0124
STEC
Tier 4
Conceptual
Cancelled tab
69 Jun 2031 Airport
Victoria County
Airport

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.