Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Travis County. First named in the release with data as of February 1, 2016.

Traviscounty as printed
138kV
LCRATSCutility
3projects listed

A HIFLD substation record has the same name and county: SHADOW GLEN (TRAVIS County). The names agree; that does not confirm they are the same facility.

Generation interconnection requests filed in Travis, TX: ERCOT queue, 8 active of 8. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
HarrisBranch_ShadowGlen_Transmission_Line_Upgrade
LCRA TSC will upgrade T574 Harris Branch - Shadow Glen 138-kV transmission line to achieve a higher operational rating.
ERCOT project 100180
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 Harris Branch to Shadow Glen
Travis County
Harris Branch, Shadow Glen
Harris Branch - Shadow Glen Transmission Line Upgrade
Upgrade the 2.97-mile Harris Branch - Shadow Glen 138-kV circuit to achieve a minimum 706 MVA emergency rating. This is an LCP Upgrade project to support Batch Zero Base Load
ERCOT project 110180
LCRATSC
Tier 4
Conceptual
Future tab
138 May 2028 Harris Branch to Shadow Glen
Travis County
Harris Branch, Shadow Glen
LCRATSC_Manor_Shadow_Glen_Transmission_Line_Upgrade
Upgrade the existing T649 Manor - Shadow Glen 138-kV transmission line to a minimum 105 deg. F ambient temperature rating of 700 MVA
ERCOT project 99818
LCRATSC
Tier 4
Planned
Future tab
138 May 2028 7323 to 7330
Travis County
T649 Manor, Shadow Glen

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026110180First listedon the Future tab
October 1, 2025100180First listedon the Future tab
October 1, 202599818First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.