Named in 3 listed projects in ERCOT’s transmission project tracking workbook, in Tom Green County. First named in the release with data as of February 1, 2015.
Expansion at an existing substation: new or expanded yard. The quoted wording describes a new or expanded yard, bus, bay or station at this substation. “Expand 345 kV Station” — project 103822, as the utility reported it
A project here also describes a named load connected: “Interconnect the Juvo load to the existing Red Creek 345 kV station” (project 103822)
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Tom Green, TX: ERCOT queue, 13 active of 13. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Red Creek: Expand 345 kV Station Interconnect the Juvo load to the existing Red Creek 345 kV station ERCOT project 103822 · utility no. TP2025786 |
AEP TNC Tier 4 |
Planned Future tab |
345 | Aug 2028 | Red Creek Tom Green County |
Red Creek |
| Red Creek: Expand 345 kV Station Interconnect the Skybox load to the existing Red Creek 345 kV station ERCOT project 109841 · utility no. TP2026069 |
AEP TNC Tier 4 |
Planned Current-year planned tab |
345 | Jun 2026 | Red Creek Tom Green County |
Red Creek |
| SAPS to Red Creek: Rebuild 138 kV Line Rehab the SAPS to Red Creek 138 kV line ERCOT project 70712 · utility no. TA2020210 · RPG 26RPG003 |
AEP TNC Tier 3 |
Planned Future tab |
138 | Jun 2028 | SAPS to Red Creek Tom Green County |
SAPS, Red Creek |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 109841 | First listed | on the Current-year planned tab |
| June 1, 2026 | 103822 | First listed | on the Future tab |
| June 1, 2026 | 70712 | Projected in-service date | Feb 2028 → Jun 2028 |
| October 1, 2025 | 70712 | Projected in-service date | Jul 2027 → Feb 2028 |
| June 1, 2025 | 70712 | Projected in-service date | May 2027 → Jul 2027 |
| October 1, 2024 | 70712 | Projected in-service date | Nov 2026 → May 2027 |
| June 1, 2024 | 70712 | Projected in-service date | Dec 2024 → Nov 2026 |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.