Dermott
Named in 4 listed projects in ERCOT’s transmission project tracking workbook, in Scurry County. First named in the release with data as of October 1, 2025.
Also printed as: Dermott Switch
A HIFLD substation record has the same name and county: DERMOTT (SCURRY County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Scurry, TX: ERCOT queue, 17 active of 23. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Union - Dermott 138 kV Line Rebuild Rebuild existing 138 kV Line ERCOT project 105063 · utility no. R8839 · RPG 26RPG014 |
ONCOR Tier 3 |
Planned Future tab |
138 | May 2027 | Union to Dermott Scurry County |
Union, Dermott |
| Ad Hoc TPIT: Rebuild approximately 3.33-mile 345 kV double circuit from WETT's Mhos to Oncor's Dermott Switch station ERCOT project 110657 |
WETT Tier 3 |
Conceptual Future tab |
345 | Feb 2028 | Mhos 345 kV to Oncor's Dermott Switch 345 kV station Scurry County |
Mhos, Dermott Switch |
| Union (fka Sun) - Golden Switch - Dermott 138 kV line Rebuild Add Permian Basin Reliability Plan Upgrade ID L22C. Upgrade the existing Union (fka Sun) - Golden Switch - Dermott 138-kV line ERCOT project 99369 · utility no. PB_L22_C |
ONCOR Tier 3 |
Planned Future tab |
138 | Jun 2027 | Union to Dermott Scurry County |
Union, Dermott |
| Union (fka Sun) - Ranger Camp 138 kV Line Rebuild Add Permian Basin Reliability Plan Upgrade ID L22B. Upgrade the existing Union (fka Sun) - Ranger Camp 138-kV line. ERCOT project 99520 · utility no. PB_L22_B |
ONCOR Tier 3 |
Planned Future tab |
138 | Jun 2028 | Union to Dermott Scurry County |
Union, Dermott |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 110657 | Projected in-service date | Oct 2030 → Feb 2028 |
| July 13, 2026 | 110657 | First listed | on the Future tab |
| June 1, 2026 | 105063 | First listed | on the Future tab |
| October 1, 2025 | 99369 | First listed | on the Future tab |
| October 1, 2025 | 99520 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.