Anastase

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Runnels County. First named in the release with data as of October 1, 2025.

Runnelscounty as printed
138kV
AEP TNCutility
1projects listed

Described as new. The quoted wording calls this substation new. “Anastase: Construct New 138 kV Station” — project 99540 title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Runnels, TX: ERCOT queue, 8 active of 8. Same county, not the same substation.

Location

Runnels County, TX

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: No point. TPIT places the station on the Ballinger to Red Creek 138 kV line; TPIT narrows it to the section between Ballinger and Weiss; Ballinger is in OpenStreetMap (AEP Ballinger Substation, way 119137383, 31.7412,-99.9446), Weiss is not; the line's far end is AEP San Angelo Red Creek (way 171818841, 31.5289,-100.3211). The station is somewhere on that line; no public document found that draws or describes its site.

Note: TPIT status Conceptual.

Sources: ERCOT TPIT, project(s) 99540 (release 39, 2026-10-01) · OpenStreetMap: Ballinger Substation (way 119137383), San Angelo Red Creek Substation (way 171818841) (OSM extract 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Anastase: Construct New 138 kV Station
Interconnect Rutile BESS to the new Anastase 138 kV station on the Ballinger to Red Creek 138 kV line between Ballinger and Weiss
ERCOT project 99540 · utility no. TP2025343
AEP TNC
Tier 4
Conceptual
Future tab
138 Mar 2028 Anastase
Runnels County
Anastase

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
June 1, 202699540Moved between tabsCurrent-year planned → Future
June 1, 202699540Projected in-service dateJun 2026 → Mar 2028
February 1, 202699540Moved between tabsFuture → Current-year planned
October 1, 202599540First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.