Royse
Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Rockwall County, plus 2 on its Cancelled tab. First named in the release with data as of February 1, 2015.
Also printed as: Royse Switch
A HIFLD substation record has the same name and county: ROYSE (ROCKWALL County). The names agree; that does not confirm they are the same facility.
Generation interconnection requests filed in Rockwall, TX: ERCOT queue, 1 active of 1. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Royse Switch – Farmersville Switch 345 kV Double-Circuit Line Upgrade Royse Switch – Farmersville Switch 345 kV Double-Circuit Line ERCOT project 99066 · utility no. M4255 · RPG 25RPG004 |
ONCOR Tier 1 |
Planned Future tab |
345 | Dec 2028 | Farmersville Switch to Royse Switch Collin / Rockwall County |
Farmersville Switch, Royse Switch |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Forney Switch 345 kV Terminal Equipment Upgrade the terminal equipment at Forney 345 kV Switch ERCOT project 5496 · utility no. M3022 |
ONCOR Tier 4 |
Planned Cancelled tab |
345 | May 2026 | Royse Rockwall County |
Royse |
| Royse South 345/138 kV Switching Station Establish new 345/138 kV switching station ERCOT project 5524 · utility no. M4234 · RTP 2017-NC34 |
ONCOR Tier 3 |
Conceptual Cancelled tab |
345 | May 2030 | Royse to Forney Rockwall County |
Royse, Forney |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 99066 | Projected in-service date | Dec 2027 → Dec 2028 |
| October 1, 2025 | 99066 | First listed | on the Future tab |
| June 1, 2024 | 5496 | Status as reported | Conceptual → Planned |
| June 1, 2024 | 5496 | Projected in-service date | May 2024 → May 2026 |
| June 1, 2024 | 5524 | Moved between tabs | Future → Cancelled |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.