Substation Scout

Rockwall, TX interconnection queue

1 active project totalling 125.3 MW in the ERCOT queue.

1active projects
125.3active MW
1total filed
Queue IDProjectkVMWResourceStatus
26INR0418 TE Smith Storage 2 345 125.3 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.