Barber Lake

Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Mitchell County. First named in the release with data as of June 1, 2022.

Mitchellcounty as printed
138kV
ONCORutility
2projects listed

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Mitchell, TX: ERCOT queue, 17 active of 19. Same county, not the same substation.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Ranger Camp Switch - Barber Lake Switch 138 kV Line (East Circuit, 2nd Circuit)
Add Permian Basin Reliability Plan Upgrade ID L22A. Install a new 3.68-mile, 138 kV second conductor on existing double-circuit structures from Ranger Camp to Barber Lake (via Frontier)
ERCOT project 99284 · utility no. PB_L22_A
ONCOR
Tier 3
Planned
Future tab
138 Dec 2027 Ranger Camp to Barber Lake
Mitchell County
Ranger Camp, Barber Lake
China Grove - 900126 (towards Barber Lake) 138 kV Line Section Rebuild
Add Permian Basin Reliability Plan Upgrade ID L22F. Upgrade the existing China Grove - 900126 138-kV line
ERCOT project 99367 · utility no. PB_L22_F
ONCOR
Tier 4
Planned
Future tab
138 May 2027 China Grove to Barber Lake
Mitchell County
China Grove, Barber Lake

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
October 1, 202599284First listedon the Future tab
October 1, 202599367First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.